896kW PV installation on industrial site

896kW PV installation on industrial site

 

Myriad Heat & Power Products Ltd have completed the final commissioning of 896kW roof mounted PV system.

The client has a number of large industrial buildings which housed energy hungry processing equipment.

The client were originally focused on the supply of quarried/recycled aggregates, site clearance, contract crushing and disposal of contaminated materials. As the Energy from Waste industry grew, they developed the process for Incinerator Bottom Ash (“IBA”) to be carefully blended with aggregate to provide a more sustainable, lower cost and higher quality product. They now have one of the most advanced IBA recycling facilities in Europe.

The processes involved in this business model are extremely energy intensive and both the Midlands sites are use vast amounts of electricity and as with many UK businesses they have had to deal with steep increases in electricity prices over the last two years.

All the details can be found in our case study area here:

For any support with your system call our team or send us an enquiry via our website here  https://www.myriadproducts.co.uk/contact-us

The Myriad service team can be contacted via sales@myriadproducts.co.uk  or on 0203 189 0666

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
I’m thrilled to be speaking at #IMHX!
by Paul Clark, September 9 2025
Following the success of the UK Warehouse Association 2022 Solar Toolkit, an updated and enhanced edition is being launched this week. This...
feature image
New generation connections are being managed more closely
by Paul Clark, August 14 2025
Navigating DNO Connection Offers: Why Timing is Critical for PV Installations When developing a site for a new photovoltaic (PV) installation, one of...
feature image
Hi-rise PV installation
by Paul Clark, July 15 2025
Myriad have recently completed a new installation of a solar PV system on a high rise block in central London. The panels were fitted to a specialist...