PV installation on 10x Academy Schools

PV installation on 10x Academy Schools

 

Myriad Heat & Power Products Ltd have completed the final commissioning of all 10 schools for an Academy Trust with schools accross the UK.

The PV system sizes ranged from 10kW to 120kW. All used Solar Edge inverters with optomisation.

The systems were a mixture of flat roofs and sloped metal and tiled roofs.

Myriad undrtook the detail deaign of all all the sites including the mounting kits and electrical connections. Myriad then procured the equipment and completed the installations over a 10 week period. 

All the details can be found in our case study area here:

For any support with your system call our team or send us an enquiry via our website here  https://www.myriadproducts.co.uk/contact-us

The Myriad service team can be contacted via sales@myriadproducts.co.uk  or on 0203 189 0666

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
Boiler monitoring added to Myriad's mHUB system
by Paul Clark, May 31 2025
Myriad has improved their mHUB fuel monitoring to include boiler monitoring as well, all in one dashboard Multiple dashboards for multiple...
feature image
How is the Minimum Energy Efficiency Standards (MEES) changing?
by Paul Clark, May 27 2025
How the Minimum Energy Efficiency Standards (MEES) Are Changing – What You Need to Know The UK’s Minimum Energy Efficiency Standards (MEES) are...
feature image
Is Biomass the lowest cost low carbon fuel?
by Paul Clark, March 10 2025
Biomass boilers can be a cost-effective low-carbon heating option for commercial buildings in the UK, but whether they are the lowest-cost depends on...