Commercial Biomass - Glasshouse 2x 900kW Biomass

Commercial Biomass - Glasshouse 2x 900kW Biomass

The System

This system is made up of two industrial 900kW Endress VR-W biomass boilers (1.8MW in total), a scraper floor fuel store and two fuel feeds that ensure each boiler is independently fed.

Myriad project managed this installation. A large fuel store warehouse was supplied in an external shed, allowing the client to store fuel en mass and deliver it to the boiler fuel store as and when it is required.

The scraper ‘walking’ floor allows for each boiler to be fed separately, and moves fuel evenly across the bottom of the fuel store and into the auger. The highlight of this process is the independent feeding systems from the single fuel store which means that each boiler stands separately according to the RHI, therefore increasing their Renewable Heat Incentive income.

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
2.7MW PV install progress
by Paul Clark, January 8 2025
Myriad have just started a 2.7MW solar PV installation contract accross 7 brand new buildings. This is the latest PV job for Myriad - lots of big...
feature image
New 2.7MW PV install starting
by Paul Clark, August 10 2024
Myriad have just started a 2.7MW solar PV installation contract accross 7 very large brand new buildings. This is the latest PV job for Myriad - lots...
feature image
New PV install on manufacturing site
by Paul Clark, June 12 2024
Myriad have recently completed a new installation on the roof of a manufacturing site. UK manufacturers often have huge electricity bills which means...