Commercial Biomass - Glasshouse 2x 900kW Biomass

Commercial Biomass - Glasshouse 2x 900kW Biomass

The System

This system is made up of two industrial 900kW Endress VR-W biomass boilers (1.8MW in total), a scraper floor fuel store and two fuel feeds that ensure each boiler is independently fed.

Myriad project managed this installation. A large fuel store warehouse was supplied in an external shed, allowing the client to store fuel en mass and deliver it to the boiler fuel store as and when it is required.

The scraper ‘walking’ floor allows for each boiler to be fed separately, and moves fuel evenly across the bottom of the fuel store and into the auger. The highlight of this process is the independent feeding systems from the single fuel store which means that each boiler stands separately according to the RHI, therefore increasing their Renewable Heat Incentive income.

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
Solar PV Standard House Type Design Consultancy
by Tarek Zinabidine, October 14 2026
Project Update | Wates Residential Revit-based solar PV design across 28 standard house types Wates Residential approached Myriad to provide...
feature image
Roof man safe systems and solar PV
by Paul Clark, July 20 2026
Solar PV systems are not fit and forget, and they do need regular maintenance and cleaning of both the ground level components (inverters, DB...
feature image
Solar PV installation on a standing seam roof
by Paul Clark, April 16 2026
Myriad have recently completed a new installation of a solar PV system on a office complex in Woking with a standing seam roof covering. Fitting ...