Commercial Biomass - Glasshouse 2x 900kW Biomass
Commercial Biomass - Glasshouse 2x 900kW Biomass
The System
This system is made up of two industrial 900kW Endress VR-W biomass boilers (1.8MW in total), a scraper floor fuel store and two fuel feeds that ensure each boiler is independently fed.
Myriad project managed this installation. A large fuel store warehouse was supplied in an external shed, allowing the client to store fuel en mass and deliver it to the boiler fuel store as and when it is required.
The scraper ‘walking’ floor allows for each boiler to be fed separately, and moves fuel evenly across the bottom of the fuel store and into the auger. The highlight of this process is the independent feeding systems from the single fuel store which means that each boiler stands separately according to the RHI, therefore increasing their Renewable Heat Incentive income.






News


