Commercial Biomass - Glasshouse 2x 900kW Biomass

Commercial Biomass - Glasshouse 2x 900kW Biomass

The System

This system is made up of two industrial 900kW Endress VR-W biomass boilers (1.8MW in total), a scraper floor fuel store and two fuel feeds that ensure each boiler is independently fed.

Myriad project managed this installation. A large fuel store warehouse was supplied in an external shed, allowing the client to store fuel en mass and deliver it to the boiler fuel store as and when it is required.

The scraper ‘walking’ floor allows for each boiler to be fed separately, and moves fuel evenly across the bottom of the fuel store and into the auger. The highlight of this process is the independent feeding systems from the single fuel store which means that each boiler stands separately according to the RHI, therefore increasing their Renewable Heat Incentive income.

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
Boiler monitoring added to Myriad's mHUB system
by Paul Clark, May 31 2025
Myriad has improved their mHUB fuel monitoring to include boiler monitoring as well, all in one dashboard Multiple dashboards for multiple...
feature image
How is the Minimum Energy Efficiency Standards (MEES) changing?
by Paul Clark, May 27 2025
How the Minimum Energy Efficiency Standards (MEES) Are Changing – What You Need to Know The UK’s Minimum Energy Efficiency Standards (MEES) are...
feature image
Is Biomass the lowest cost low carbon fuel?
by Paul Clark, March 10 2025
Biomass boilers can be a cost-effective low-carbon heating option for commercial buildings in the UK, but whether they are the lowest-cost depends on...