Commercial Biomass - Wildlife Park

Commercial Biomass - Wildlife Park

Works Carried Out

  • Replacement of a faulty heat meter
  • Survey on the other six heat meters to ensure they have been installed according to the manufacturers instructions
  • Survey of the other six biomass boilers and creation of RHI system schematics
waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
Boiler monitoring added to Myriad's mHUB system
by Paul Clark, May 31 2025
Myriad has improved their mHUB fuel monitoring to include boiler monitoring as well, all in one dashboard Multiple dashboards for multiple...
feature image
How is the Minimum Energy Efficiency Standards (MEES) changing?
by Paul Clark, May 27 2025
How the Minimum Energy Efficiency Standards (MEES) Are Changing – What You Need to Know The UK’s Minimum Energy Efficiency Standards (MEES) are...
feature image
Is Biomass the lowest cost low carbon fuel?
by Paul Clark, March 10 2025
Biomass boilers can be a cost-effective low-carbon heating option for commercial buildings in the UK, but whether they are the lowest-cost depends on...