hotel&leiser wildlife 1

Project Solution

Client Challenges

Myriad were contacted by the park following an RHI audit with one of the biomass boilers on the site, in order to assist with the issues that were identified

A service contract was taken out on all of the seven boilers across the site, together with a number of RHI related works and consultancies.

environmental-policy

Works Carried Out

  • Replacement of a faulty heat meter
  • Survey on the other six heat meters to ensure they have been installed according to the manufacturers instructions
  • Survey of the other six biomass boilers and creation of RHI system schematics

Services Rendered in This Project

Whilst most Ariterm biomass heating systems are custom installations, there are some standardised products that we regularly take care of for our clients. Here are the popular Ariterm biomass boiler models.

Biomass Services

  • Remote Technical Support
  • Complete 65-part boiler health check
  • Tailored Service & Maintenance
  • Spares & Consumables
  • 24/7 Emergency Response
  • Fuel Supply & Management
  • Boiler Performance Optimisation

Plantroom Services

  • Oil, LPG & Gas Systems
  • Repair, Upgrade & Refurbishment
  • Condition & Operation Report
  • Pump sets & Controls
  • Project and M&E Services
  • Water Sampling

Business Services

  • RHI Protection
  • Boiler Buy Back
  • Site Training
  • Asset Assessment
  • Project Management
  • SMS Text Monitoring
commercial ss1-1
commecial ss 2
commecial ss 3
commercial ss1
commercial ss1-1
commecial ss 2
commecial ss 3
commercial ss1
waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
PV installation on 10x Academy Schools
by Paul Clark, October 28 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of all 10 schools for an Academy Trust with schools accross the UK. ...
feature image
896kW PV installation on industrial site
by Paul Clark, September 21 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of 896kW roof mounted PV system. The client has a number of large...
feature image
190kW PV installation on wood product manufacturing site
by Paul Clark, August 20 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of 166kW roof mounted PV system. The client is a manufacturer of...