Case Studies

Myriad has designed, supplied, installed and maintained over 2,000 commercial and industrial renewable heat & power systems nationally, working within a variety of sectors including agriculture, education, leisure, public sector, residential and more.

Speak to our specialists today

Case Studies

Myriad has designed, supplied, installed and maintained over 2,000 commercial and industrial renewable heat & power systems nationally, working within a variety of sectors including agriculture, education, leisure, public sector, residential and more.

Speak to our specialists today

£4 Million, 21 site, Biomass System

179 x 199kW Biomass boilers installed into packaged plant rooms, housed in purpose-built, prefabricated containers.

Read More

10x Academy Schools

Midlands
465 Kw peak, 1084 panels Over 10 Schools
Roof mounted panels
414,360 kWh/yr
Estimated pay back: 3 years

Read More

IBA Processing Plant

Incinerator Ash Processing Company
100 kWp 
Export limitation (69kW)
96,877 kWh per year.
Estimated pay back: 5 years

Read More

A1 Fencing

Fence contractor in Cambridgeshire.
100 kWp 
Export limitation (69kW)
96,877 kWh per year.
Estimated pay back: 5 years

Read More

26 Poultry sheds

6 x 995kw Commercial Biomass boilers heating 26 Poultry sheds through renewable technology.

Read More

Fox Farm Shop

South West England
49W peak  [89x 550W panels]
Export limited to 9kW
Roof mounted panels
41,740 kWh
Estimated pay back: 3.3yrs

Read More

Drying Kilns

500kW Herz industrial biomass boiler to provide heating to both the manufacturing process and also to the drying kilns.

Read More

Garden Centre

South West England
363kW peak  [660x 550W panels]
export limited to 200kW
Roof mounted panels
297,000 kWh
Estimated pay back: 3.9 yrs

Read More

Residential Seminar College

West Midlands
Solar PV + Battery storage
103kW peak
Ground mounted panels
Batteries: 206kWh

Read More

Independent School - Commercial Biomass

A pair of 300kW Herz Biomatic boilers were installed over two phases into a purpose-built energy centre plant room to provide in excess of 21,000 litres of hot water

Read More

Wildlife Park

Instalation of 7 Biomass Boilers from 40kW to 199kW, heat meters and RHI related works

Read More

Get in Touch

Or call