Commercial Biomass - Motorway Service Station

Commercial Biomass - Motorway Service Station

Details

As a 24 hour service station, the services buildings require high levels of heat throughout the day, particularly during the heating season.

With the redevelopment of the services site, renewable heating or power was a building regulation necessity, and our client opted for biomass heating.

They required a solution that would not disrupt the site due to constant traffic and pedestrian movement. Thus a pre-fabricated packaged solution was suggested.

The benefits of this solution include the off-site prefabrication and testing, the compact size and available for delivery to site in a short turnaround time.

Rural Energy delivered the Herz boiler to the packaged plant room manufacturer and installed it before delivery to site and integration with the heating system. The plant room sits behind the main service building and is finished in a matching colour and style, blending in with the site.

Since this installation, out client have expanded their biomass remit to other sites. Rural Energy’s partner company has provided two more packaged solutions with Herz boilers.

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
Roof man safe systems and solar PV
by Paul Clark, July 20 2026
Solar PV systems are not fit and forget, and they do need regular maintenance and cleaning of both the ground level components (inverters, DB...
feature image
Solar PV installation on a standing seam roof
by Paul Clark, April 16 2026
Myriad have recently completed a new installation of a solar PV system on a office complex in Woking with a standing seam roof covering. Fitting ...
feature image
New build residential solar PV
by Paul Clark, November 28 2025
Project Update | Narberth We’re proud to be delivering a major renewable energy installation at the Narberth development – a large domestic scheme...