Commercial Biomass - Poultry Farm

Commercial Biomass - Poultry Farm

With nine large broiler houses of 300x70ft each, the farm used 150,000 litres of LPG plus 65,000 litres of oil per year. Finding a more cost-effective heating system was very important.

Wood chip heating offered a significant pence per kilowatt (p/kWh) saving. Myriad designed a Herz Biofire 995kW wood chip biomass boiler system to provide the necessary heat and hot water for the sheds and ventilation system.

The fully automated Herz Biofire is able to burn chip with a moisture content of up to 40% and a robust, heavy duty spring arm agitator with additional drive motor for the feed auger, ensures a reliable fuel delivery to the boiler.

Two ceiling-mounted ventilation units combined with the biomass boiler, which produces much lower emissions compared to traditional boilers, provide the best results within the broiler sheds for the chicks.

Our client saves at least one day of feed per crop as the chicks will reach target weight quicker and with fewer losses in numbers due to the reduction in harmful emissions caused by the old heaters.

Overall there is a saving of over £120,000 per year on fuel and service costs, a day of feed per crop plus an earning of £126,000 from the R.H.I.

Our client also has a 4 star service and maintenance contract to ensure their investment is protected. This includes the annual full service and safety inspection, as well as the interim service. The client has access to weekday technical phone support which gives him access to our fully trained service desk engineer, and out-of-hours support if required. The client also took our optional flue cleaning service.

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
I’m thrilled to be speaking at #IMHX!
by Paul Clark, September 9 2025
Following the success of the UK Warehouse Association 2022 Solar Toolkit, an updated and enhanced edition is being launched this week. This...
feature image
New generation connections are being managed more closely
by Paul Clark, August 14 2025
Navigating DNO Connection Offers: Why Timing is Critical for PV Installations When developing a site for a new photovoltaic (PV) installation, one of...
feature image
Hi-rise PV installation
by Paul Clark, July 15 2025
Myriad have recently completed a new installation of a solar PV system on a high rise block in central London. The panels were fitted to a specialist...