Commercial Biomass - Poultry Farm

Herz Biofire 995KW

5* SERVICE CONTRACT

SECTOR: POULTRY
BOILER: HERZ BIOFIRE
BOILER SIZE: 995kW
FUEL TYPE:
WOOD CHIP
FUEL STORE: PURPOSE BUILT
LOCATION(S): NORTHAMPTON
CONTRACT:
  • FULL SERVICE & SAFETY INSPECTION
  • BOILER COMBUSTION OPTIMISATION
  • INTERIM SERVICE
  • WEEKLY TECHNICAL PHONE SUPPORT
Agriculture Poultry 6

Project Solution

As with many poultry farmers in the UK, our client was looking for a better way to heat their nine large sheds which would deal with the issues of humidity and harmful emissions which arise from using a traditional system of direct fired heaters. Saving money on fuel bills at the same time was also important.

environmental-policy

With nine large broiler houses of 300x70ft each, the farm used 150,000 litres of LPG plus 65,000 litres of oil per year. Finding a more cost-effective heating system was very important.

Wood chip heating offered a significant pence per kilowatt (p/kWh) saving. Myriad designed a Herz Biofire 995kW wood chip biomass boiler system to provide the necessary heat and hot water for the sheds and ventilation system.

The fully automated Herz Biofire is able to burn chip with a moisture content of up to 40% and a robust, heavy duty spring arm agitator with additional drive motor for the feed auger, ensures a reliable fuel delivery to the boiler.

Two ceiling-mounted ventilation units combined with the biomass boiler, which produces much lower emissions compared to traditional boilers, provide the best results within the broiler sheds for the chicks.

Our client saves at least one day of feed per crop as the chicks will reach target weight quicker and with fewer losses in numbers due to the reduction in harmful emissions caused by the old heaters.

Overall there is a saving of over £120,000 per year on fuel and service costs, a day of feed per crop plus an earning of £126,000 from the R.H.I.

Our client also has a 4 star service and maintenance contract to ensure their investment is protected. This includes the annual full service and safety inspection, as well as the interim service. The client has access to weekday technical phone support which gives him access to our fully trained service desk engineer, and out-of-hours support if required. The client also took our optional flue cleaning service.

Services Rendered in This Project

Whilst most Ariterm biomass heating systems are custom installations, there are some standardised products that we regularly take care of for our clients. Here are the popular Ariterm biomass boiler models.

Biomass Services

  • Remote Technical Support
  • Complete 65-part boiler health check
  • Tailored Service & Maintenance
  • Spares & Consumables
  • 24/7 Emergency Response
  • Fuel Supply & Management
  • Boiler Performance Optimisation

Plantroom Services

  • Oil, LPG & Gas Systems
  • Repair, Upgrade & Refurbishment
  • Condition & Operation Report
  • Pump sets & Controls
  • Project and M&E Services
  • Water Sampling

Business Services

  • RHI Protection
  • Boiler Buy Back
  • Site Training
  • Asset Assessment
  • Project Management
  • SMS Text Monitoring
agreeculture PF 1
agreeculture PF 2
agreeculture PF 3
agreeculture PF 4
agreeculture PF 2
agreeculture PF 7
agreeculture PF 8
agreeculture PF 1
agreeculture PF 2
agreeculture PF 3
agreeculture PF 4
agreeculture PF 2
agreeculture PF 7
agreeculture PF 8

Commercial Biomass - MOD

Commercial Biomass - Healthcare Facility

Commercial Biomass - Healthcare

Commercial Biomass - Public Sector

waste-wood-legislative-framework-img

Download Our Technical Update

News

feature image
[VIDEO] WASTE WOOD BOILER INSTALLATION
by Admin, December 16 2021
See our sister company installing a 1MW Herz Industrial WID compliant boiler to provide heat to the clients drying floors. BOILER OFFLOADING ...
feature image
3D FIREMATIC FLYBY VIDEO
by Admin, December 16 2021
Watch this 3D flyby video of a Herz Firematic 499kW biomass boiler with a V-Profile fuel store feeding the boiler pellet fuel through the rigid auger...
feature image
RHI INFORMATION - MAY 2017
by Admin, December 16 2021
The proposed amendments to the RHI scheme are surrounded by some uncertainty due to a lack of clarity from the Department for BEIS regarding their...