Commercial Biomass - Poultry Farm

Commercial Biomass - Poultry Farm

The client was keen to meet carbon reduction targets set by the Government, intending on becoming self-sufficient from green energy as a business by 2016 and carbon neutral as a whole by 2020. They have already invested in other technologies for electricity such as wind and solar, and turned to Rural Energy to meet their heating needs.

Part of a £24.5 million development, the project was worth over £4 million to Rural Energy and followed more than 12 months of careful planning with the renewable financers. Now the Herz Firematic boilers have been installed into more than 21 of the turkey group’s farm sites.

Rural Energy installed the Herz boilers into packaged plant rooms constructed by Armstrong or Baxi/PPS.

The 180 x 150kW or 199kW Firematics (providing over 30MW of heating in total) are housed in purpose built, prefabricated containers. Prefabricating these reduced any disruption on site, allowing the turkey farms to continue operating normally. Each site has an average of eight or nine poultry sheds, with the largest having 34.

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
I’m thrilled to be speaking at #IMHX!
by Paul Clark, September 9 2025
Following the success of the UK Warehouse Association 2022 Solar Toolkit, an updated and enhanced edition is being launched this week. This...
feature image
New generation connections are being managed more closely
by Paul Clark, August 14 2025
Navigating DNO Connection Offers: Why Timing is Critical for PV Installations When developing a site for a new photovoltaic (PV) installation, one of...
feature image
Hi-rise PV installation
by Paul Clark, July 15 2025
Myriad have recently completed a new installation of a solar PV system on a high rise block in central London. The panels were fitted to a specialist...