The client was keen to meet carbon reduction targets set by the Government, intending on becoming self-sufficient from green energy as a business by 2016 and carbon neutral as a whole by 2020. They have already invested in other technologies for electricity such as wind and solar, and turned to Rural Energy to meet their heating needs.

Part of a £24.5 million development, the project was worth over £4 million to Rural Energy and followed more than 12 months of careful planning with the renewable financers. Now the Herz Firematic boilers have been installed into more than 21 of the turkey group’s farm sites.

Rural Energy installed the Herz boilers into packaged plant rooms constructed by Armstrong or Baxi/PPS.

The 180 x 150kW or 199kW Firematics (providing over 30MW of heating in total) are housed in purpose built, prefabricated containers. Prefabricating these reduced any disruption on site, allowing the turkey farms to continue operating normally. Each site has an average of eight or nine poultry sheds, with the largest having 34.

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
Is Biomass the lowest cost low carbon fuel?
by Paul Clark, March 10 2025
Biomass boilers can be a cost-effective low-carbon heating option for commercial buildings in the UK, but whether they are the lowest-cost depends on...
feature image
500kW Biomass boiler with RHI
by Paul Clark, February 12 2025
Myriad have secured a contract to supply and install a new 500kW biomass boiler into a poultry farmner in the Midlands. Myriad purchased a 500kW...
feature image
New PV install on door manufacturing site 474kW
by Paul Clark, January 30 2025
Myriad have recently completed a new installation on the roof of a door manufacturing site in the West Midlands. UK manufacturers often have huge...