Commercial Biomass - MOD

Commercial Biomass - MOD

Client Challenges

The client had been let down by their previous biomass service provider, so they turned to Myriad Plantroom Services for urgent support to get their Endress biomass boiler back up to full and efficient operation.

Problems

  • The refractory lining of the Endress boiler had become damaged during operation.
  • The ash auger was also damaged beyond repair.
waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
Boiler monitoring added to Myriad's mHUB system
by Paul Clark, May 31 2025
Myriad has improved their mHUB fuel monitoring to include boiler monitoring as well, all in one dashboard Multiple dashboards for multiple...
feature image
How is the Minimum Energy Efficiency Standards (MEES) changing?
by Paul Clark, May 27 2025
How the Minimum Energy Efficiency Standards (MEES) Are Changing – What You Need to Know The UK’s Minimum Energy Efficiency Standards (MEES) are...
feature image
Is Biomass the lowest cost low carbon fuel?
by Paul Clark, March 10 2025
Biomass boilers can be a cost-effective low-carbon heating option for commercial buildings in the UK, but whether they are the lowest-cost depends on...