Commercial Biomass - Healthcare Facility

Commercial Biomass - Healthcare Facility

Details

Myriad, contracted through Hilton Building Services Ltd, designed, installed and commissioned a 500kW Herz BioMatic for the new centre. With specifications for wood chip fuel, our Technical Design team detailed a sunken fuel store to accommodate tipped wood chip deliveries.

The base of the store contains a 6m diameter hinged arm agitator which moves wood chip onto the auger, conveying it to a climbing screw which transports the fuel into the Herz boiler in the adjacent plant room.

With the project being part of a new build site there was adequate opportunity to earmark a purpose built fuel store and plant room to sufficiently provide heat and hot water to the site.

The centre also has rain water harvesting, improving the site sustainability.

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
Roof man safe systems and solar PV
by Paul Clark, July 20 2026
Solar PV systems are not fit and forget, and they do need regular maintenance and cleaning of both the ground level components (inverters, DB...
feature image
Solar PV installation on a standing seam roof
by Paul Clark, April 16 2026
Myriad have recently completed a new installation of a solar PV system on a office complex in Woking with a standing seam roof covering. Fitting ...
feature image
New build residential solar PV
by Paul Clark, November 28 2025
Project Update | Narberth We’re proud to be delivering a major renewable energy installation at the Narberth development – a large domestic scheme...