Jeld Wen

Project Solution

Spring 2014 saw Myriad Heat and Power secure a considerable contract to supply 179 Herz Firematics to a giant poultry grower who rear over 7 million turkeys a year on their farms across Norfolk, Suffolk and Lincolnshire.

 

The client was keen to meet carbon reduction targets set by the Government, intending on becoming self-sufficient from green energy as a business by 2016 and carbon neutral as a whole by 2020. They have already invested in other technologies for electricity such as wind and solar, and then turned to Myriad Heat and Power to meet their heating needs.

huge-pile-fresh-woodchips-against-sky 1500x1000

Details

 

Part of a £24.5 million development, the project was worth over £4 million to Myriad Heat and Power and follows more than 12 months of careful planning with renewable financers Lumicity. Now the Herz Firematics' have been installed into more than 21 of the turkey group’s farm sites.

Lumicity put together a specialist consortium to deliver what is thought to be the biggest roll-out of biomass in the UK ever. Specialist contractors included Armstrong, Baxi Commercial and PPS.

Myriad Heat and Power installed the Herz boilers into packaged plant rooms constructed by Armstrong of Baxi/PPS.

The 179 x 150kW or 199kW Firematics were housed in purpose-built, prefabricated containers. Doing this reduced any disruption on site, allowing the turkey farms to continue operating normally. Each site has an average of eight or nine poultry sheds, with the largest having 34.

Services Rendered in This Project

Whilst most biomass heating systems are custom installations, there are some standardised products that we regularly take care of for our clients.

Biomass Services

  • Remote Technical Support
  • Complete 65-part boiler health check
  • Tailored Service & Maintenance
  • Spares & Consumables
  • 24/7 Emergency Response
  • Fuel Supply & Management
  • Boiler Performance Optimisation

Plantroom Services

  • Oil, LPG & Gas Systems
  • Repair, Upgrade & Refurbishment
  • Condition & Operation Report
  • Pump sets & Controls
  • Project and M&E Services
  • Water Sampling

Business Services

  • RHI Protection
  • Boiler Buy Back
  • Site Training
  • Asset Assessment
  • Project Management
  • SMS Text Monitoring
waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
PV installation on 10x Academy Schools
by Paul Clark, October 28 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of all 10 schools for an Academy Trust with schools accross the UK. ...
feature image
896kW PV installation on industrial site
by Paul Clark, September 21 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of 896kW roof mounted PV system. The client has a number of large...
feature image
190kW PV installation on wood product manufacturing site
by Paul Clark, August 20 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of 166kW roof mounted PV system. The client is a manufacturer of...