Commercial Biomass - Multiple Poultry Sheds

Commercial Biomass - Multiple Poultry Sheds

Details

 

Part of a £24.5 million development, the project was worth over £4 million to Myriad Heat and Power and follows more than 12 months of careful planning with renewable financers Lumicity. Now the Herz Firematics' have been installed into more than 21 of the turkey group’s farm sites.

Lumicity put together a specialist consortium to deliver what is thought to be the biggest roll-out of biomass in the UK ever. Specialist contractors included Armstrong, Baxi Commercial and PPS.

Myriad Heat and Power installed the Herz boilers into packaged plant rooms constructed by Armstrong of Baxi/PPS.

The 179 x 150kW or 199kW Firematics were housed in purpose-built, prefabricated containers. Doing this reduced any disruption on site, allowing the turkey farms to continue operating normally. Each site has an average of eight or nine poultry sheds, with the largest having 34.

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
2.7MW PV install progress
by Paul Clark, January 8 2025
Myriad have just started a 2.7MW solar PV installation contract accross 7 brand new buildings. This is the latest PV job for Myriad - lots of big...
feature image
New 2.7MW PV install starting
by Paul Clark, August 10 2024
Myriad have just started a 2.7MW solar PV installation contract accross 7 very large brand new buildings. This is the latest PV job for Myriad - lots...
feature image
New PV install on manufacturing site
by Paul Clark, June 12 2024
Myriad have recently completed a new installation on the roof of a manufacturing site. UK manufacturers often have huge electricity bills which means...