[VIDEO] WASTE WOOD BOILER INSTALLATION

[VIDEO] WASTE WOOD BOILER INSTALLATION

Myriad-video-1

See our sister company installing a 1MW Herz Industrial WID compliant boiler to provide heat to the clients drying floors.

BOILER OFFLOADING

INSTALLATION: PART 1

waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
Solar PV installation on a standing seam roof
by Paul Clark, October 23 2025
Myriad have recently completed a new installation of a solar PV system on a office complex in Woking with a standing seam roof covering. Fitting ...
feature image
New generation connections are being managed more closely
by Paul Clark, August 14 2025
Navigating DNO Connection Offers: Why Timing is Critical for PV Installations When developing a site for a new photovoltaic (PV) installation, one of...
feature image
Hi-rise PV installation
by Paul Clark, July 15 2025
Myriad have recently completed a new installation of a solar PV system on a high rise block in central London. The panels were fitted to a specialist...