A well-established garden centre in the South of England required a roof-mounted solar PV system to reduce rising electricity costs and improve environmental performance. With high daytime energy demand driven by retail operations, lighting, catering, and plant care systems, the site was well suited to on-site renewable generation.

Myriad designed and delivered a 365 kWp commercial solar PV system, optimised to maximise available roof space while delivering strong annual energy yield and long-term carbon savings.

 
 

Project Snapshot 

Sector: Retail/Garden Centre
Location: South England
System size: 365kWp
PV modules: 660 x Suntech Power STP550S-C72
Inverters: 3 × SOLIS 100KW 5G
Mounting: Roof-mounted (mechanically fixed system)
Annual generation: 287,000 kWh
Payback period: 3.9 years
 
 

The Client & Requirements

The client required a solar PV system to reduce rising electricity costs across the garden centre while supporting long-term sustainability objectives. With high daytime energy demand driven by retail operations, lighting, catering, and plant care systems, the site presented an ideal load profile for solar generation.

A key requirement was to maximise the use of available roof space while carefully working around existing constraints such as skylights. The client also required a fully turnkey solution, delivered by a trusted provider capable of managing the entire process from design through to installation with minimal disruption to trading.

 

Key Challenges

The project was delivered across multiple roof areas, requiring a coordinated design approach to integrate separate sections into a single, unified solar PV system. Ensuring consistent performance and efficient electrical distribution across these areas was a key consideration.

As the site remained fully operational throughout, installation works had to be carefully planned to avoid disruption to customers and staff. Maintaining safe access, managing deliveries, and sequencing installation across different roof sections were essential to ensure smooth project delivery.

Additional challenges included optimising panel layout around roof obstructions such as skylights, while still maximising overall system capacity.

 

Solution Delivered

Detailed system design and generation modelling to provide an optimal solution
Planning, DNO, and PDR applications
Procurement and installation of Tier 1 PV modules and inverters
Procurement and installation of DC and AC electrical systems
Full commissioning and performance optimisation
Ongoing maintenance and remote generation  monitoring

 

Commercial Outcomes

Annual generation: 287,000,000 kWh
Payback period: 3.9 years
Sustainability impact: 60 tCO₂e per year (2,900Trees Planted)

 