A large multi-building commercial estate in the South of England required a high-capacity, roof-mounted solar PV solution to significantly reduce grid electricity consumption across multiple facilities. Myriad designed and delivered a 2.7 MW commercial solar PV installation, engineered to operate across several buildings while accommodating structural, electrical, and operational constraints typical of large estates.

The project was delivered as a fully coordinated, multi-inverter system, providing long-term energy cost reduction and carbon savings at scale.

 
 

Project Snapshot 

Sector: Commercial
Location: South England
System size: 2,737 kWp
PV modules:  6,084 × Trina Solar 450 W 
Inverters:  24 × Sungrow SG125CX-P2 
Mounting: Roof-mounted  (metal trapezoidal, mechanically fixed) 
Annual generation: 2,600,000 kWh
 
 

The Client & Requirements

The client required a high-capacity solar PV system that could be deployed across multiple buildings within a single commercial estate. A key objective was to maximise available roof space while delivering meaningful energy generation at megawatt scale.

The system needed to be designed and installed alongside the site’s new-build construction programme, ensuring full compliance with construction regulations and seamless integration with the developing electrical infrastructure. The client required a fully coordinated, turnkey solution capable of delivering at scale while aligning with programme timelines and regulatory requirements.

 

Key Challenges

The project was delivered in parallel with ongoing construction works, requiring close coordination with multiple contractors and strict adherence to site programme schedules.

Installation across multiple high-roof structures introduced additional complexity, requiring specialist access solutions, enhanced safety planning, and careful sequencing of works. Ensuring safe and efficient installation at height while maintaining progress across several buildings simultaneously was a key challenge throughout the project.

 

Solution Delivered

Detailed system design and multi-building array optimisation
Coordination with new-build construction and electrical infrastructure
Procurement and installation of Tier 1 PV modules and utility-scale inverters
Multi-inverter deployment and electrical balancing across buildings
Full roof-mounted mechanically fixed installation
Commissioning of a high-capacity, estate-wide solar PV system
Ongoing monitoring and performance support 
 

 

Commercial Outcomes

Annual generation: 2,600 MWH
Operational impact: Significant reduction in grid electricity consumption 
Sustainability impact: 540 tCO₂e per year aligned with ESG objectives 

 