---
title: Wildlife Park Case Study, Essex | Myriad Plantroom Services
description: Full service, boiler combustion optimisation and technical support is provided for this clients seven different biomass boilers across their site.
---

[Case Studies ](https://www.myriadproducts.co.uk/case-studies)

# [Wildlife Park Case Study, Essex | Myriad Plantroom Services](https://www.myriadproducts.co.uk/case-studies/rhi-consultancy-case-study-essex)

 Written by [Admin](https://www.myriadproducts.co.uk/case-studies/author/admin) | Dec 13, 2021 7:27:33 AM

## Works Carried Out

- Replacement of a faulty heat meter
- Survey on the other six heat meters to ensure they have been installed according to the manufacturers instructions
- Survey of the other six biomass boilers and creation of RHI system schematics

[View full post](https://www.myriadproducts.co.uk/case-studies/rhi-consultancy-case-study-essex)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Admin"
  },
  "dateModified" : "2022-02-02T14:14:42.365Z",
  "datePublished" : "2021-12-13T07:27:33Z",
  "headline" : "Commercial Biomass - Wildlife Park",
  "image" : {
    "@type" : "ImageObject",
    "height" : 333,
    "url" : "https://f.hubspotusercontent-eu1.net/hubfs/24902330/myriad-images/casestudy/hotel&leiser%20wildlife%201.png",
    "width" : 500
  },
  "mainEntityOfPage" : "https://www.myriadproducts.co.uk/case-studies/rhi-consultancy-case-study-essex",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies"
  }
}
```