Written by Admin | Dec 13, 2021 7:27:33 AM 
         
        
          Works Carried Out
- Replacement of a faulty heat meter
 
- Survey on the other six heat meters to ensure they have been installed according to the manufacturers instructions
 
- Survey of the other six biomass boilers and creation of RHI system schematics