Project Solution

Summer 2012 saw Rural Energy initiate a two phase biomass installation project at highly esteemed Independent School in Surrey.

Made up of prep and pre-prep schools on one large estate with district heating, the Schools required at least 600kW of heating for numerous buildings. The site has a heat load consumption of 1.3 million kWh per year.

environmental-policy

The System

The biomass boilers were specified to replace 20 oil-fired boilers and associated oil tanks from around the site, in order to route a district heating scheme from one central energy hub.

A pair of 300kW Herz Biomatic boilers were installed over two phases into a purpose-built energy centre plant room that has been designed to suit a third phase should the schools decide to expand.

The boilers also have separate wood chip feed augers so that they can run independently, enabling no need for oil back up. This is also ideal for earning the RHI separately for each boiler. The boilers typically provide in excess of 21,000 litres of hot water to be stored in the system at any one time.

This unique design has afforded the schools the opportunity to upscale their biomass installation and add a third biomass boiler and other renewable technologies as required over the coming years. To date, it is estimated that there is a saving of 140,000 litres of oil per year (an estimated £70,000 per year at 50p per litre of oil). Now an estimated 450 tons (1592m³ much reduced cost).

Overall the Schools have made an impressive estimated annual carbon saving of 288T of CO2.

Services Rendered in This Project

Whilst most Ariterm biomass heating systems are custom installations, there are some standardised products that we regularly take care of for our clients. Here are the popular Ariterm biomass boiler models.

Biomass Services

  • Remote Technical Support
  • Complete 65-part boiler health check
  • Tailored Service & Maintenance
  • Spares & Consumables
  • 24/7 Emergency Response
  • Fuel Supply & Management
  • Boiler Performance Optimisation

Plantroom Services

  • Oil, LPG & Gas Systems
  • Repair, Upgrade & Refurbishment
  • Condition & Operation Report
  • Pump sets & Controls
  • Project and M&E Services
  • Water Sampling

Business Services

  • RHI Protection
  • Boiler Buy Back
  • Site Training
  • Asset Assessment
  • Project Management
  • SMS Text Monitoring
education1
education 2
education 3
education 4
education 5
education 6
education 7
education 8
education1
education 2
education 3
education 4
education 5
education 6
education 7
education 8
waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
PV installation on 10x Academy Schools
by Paul Clark, October 28 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of all 10 schools for an Academy Trust with schools accross the UK. ...
feature image
896kW PV installation on industrial site
by Paul Clark, September 21 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of 896kW roof mounted PV system. The client has a number of large...
feature image
190kW PV installation on wood product manufacturing site
by Paul Clark, August 20 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of 166kW roof mounted PV system. The client is a manufacturer of...