Project Solution

This healthcare centre in the north required a service and maintenance contract for their 500kW biomass boiler.

This included:

  • Full annual service
  • Interim service
  • Combustion optimisation
  • 24/7 technical telephone support
  • Heat meter check
  • Flue clean (complex, tall flue)
commercial-biomass-boiler-hero-image

Client

Further to the planned visits, Myriad Plantroom Services have carried out remedial works highlighted on the service visits, and reacted to boiler faults and issues reported by the client within response times as defined by the standard Myriad Service Level Agreement.

The has resulted in the client renewing their contract with Myriad annually since 2016.

Myriad have also been supplying wood pellet fuel to the site on an on-demand basis since September 2017 and in the last 6 months has supplied 146 tonnes over 8 deliveries. The client’s desire was to have one supplier for all biomass fuel and service activities, which Myriad can provide.

Recently Myriad have launched a new product, “Fuel and Service Wrap”, whereby the client pays an average monthly invoice for all services, the principle of which is to make the process for the client as simple as possible and this has been warmly received.

Services Rendered in This Project

Whilst most Ariterm biomass heating systems are custom installations, there are some standardised products that we regularly take care of for our clients. Here are the popular Ariterm biomass boiler models.

Biomass Services

  • Remote Technical Support
  • Complete 65-part boiler health check
  • Tailored Service & Maintenance
  • Spares & Consumables
  • 24/7 Emergency Response
  • Fuel Supply & Management
  • Boiler Performance Optimisation

Plantroom Services

  • Oil, LPG & Gas Systems
  • Repair, Upgrade & Refurbishment
  • Condition & Operation Report
  • Pump sets & Controls
  • Project and M&E Services
  • Water Sampling

Business Services

  • RHI Protection
  • Boiler Buy Back
  • Site Training
  • Asset Assessment
  • Project Management
  • SMS Text Monitoring
horticulturfe 1
horticulturfe 2
horticulturfe 3
horticulturfe 4
horticulturfe 5
horticulturfe 1
horticulturfe 2
horticulturfe 3
horticulturfe 4
horticulturfe 5
waste-wood-legislative-framework-img

Download Our Technical Update

Download Previous Updates:

News

feature image
PV installation on 10x Academy Schools
by Paul Clark, October 28 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of all 10 schools for an Academy Trust with schools accross the UK. ...
feature image
896kW PV installation on industrial site
by Paul Clark, September 21 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of 896kW roof mounted PV system. The client has a number of large...
feature image
190kW PV installation on wood product manufacturing site
by Paul Clark, August 20 2023
Myriad Heat & Power Products Ltd have completed the final commissioning of 166kW roof mounted PV system. The client is a manufacturer of...